Hi steve ,
took a deviation on the way home today from Washington via Hebburn Dry Dock.The CSO ORELIA looks like she is having her hull blasted / painted, she had big taupaulins hanging down her sides from what I could see , this could mean that the new bow is welded in place .Last time I had a look in January, they had the new bow in the dock bottom ready to be connected.
Regards
Cawky