CSCL Star is not the first I'm afraid, she is the third? (see below) to use the new terminal, the second was MSC Ingrid overnight on the 2/3rd of February, the first was a feeder which I never saw nor heard much about, so may have never even worked the quay. So CSCL Star is either the third or second vessel on the berth, couple of photos of both large vessel just uploaded to my collection here this afternoon.
MSC Ingrid was a dual cycle working, discharge and load, CSCL is a discharge only of 669 boxes, last time I saw the manifest 18 hrs ago, thats possibly the top layer and some of the next one down. CSCL Star is due to move over to the Trinity top berth around midnight tonight to complete her cycle.
I'm not at work right now so cannot confirm actual departure time and date, wont be back until the 23rd I'm afraid. I'll check when next back at work with my shift partner, he was commissioning the new cranes so will know exactly if they worked the feeder or not.
Hope that helps
Michael