delivery of Innovation
« on: August 01, 2012, 01:38:17 PM »
HLJV Innovation had German flag hoisted yesterday in Gdansk Poland. The ship returned for short stay at the yard in Gdynia, where it was built. Final delivery documents were expected to be signed today. The ship will probably depart from Gdynia, Poland withing a few days.

A few pictures are available with this article (in Polish):
http://www.portalmorski.pl/stocznie/nowe-budowy/32625-innovation-z-cristu-podniesienie-bandery

Tech specs in English are available on Hochtief Solutions website, I suppose.


Although (with 1500 t hoisting capacity) the crane of Innovation is by far smaller in terms of SWL comparing to largest (like Thialf and Saipem 7000) and even relatively modest offshore cranes not so extremely rarely offering 2000-5000 t SWL, the Innovation gear is said to be the "most powerful" onboard typical windfarm installation vessels and jack-up type vessels available worldwide today.

One HLJV with similar (1500 t) crane capacity is on order or under construction for 2013 delivery AFAIK. Would anyone be so kind as to name / point the operator / shipyard / source of information on this unit ?...

Also - is there any typical (purpose built) windfarm installation vessel that would heve crane more powerfull than Innovation ?
« Last Edit: August 01, 2012, 01:40:33 PM by polsteam »
despite using "polsteam" for my nick I have NO personal (professional) or business connections with the company of the same name

Offline Dеnis

  • Photo Administrator
  • Home away from home
  • *****
  • Posts: 343
    • View Profile
Re: delivery of Innovation
« Reply #1 on: August 01, 2012, 01:45:19 PM »
Also - is there any typical (purpose built) windfarm installation vessel that would heve crane more powerfull than Innovation ?

Not yet.   For example MPI Adventure has a 1000t crane, Brave Tern has a 800t crane.

http://www.mpi-offshore.com/files/file/MPI_AdventureDiscovery_web.pdf?phpMyAdmin=0b6827d624b97bf2a24460fc019dbaae
http://www.windcarrier.com/brave-tern

I don't know if there will be needed a more powerful crane for WFI vessels - Ulstein has a concept of a ship that would install wind generator as one piece in a simple way:
http://www.windlifter.nl/how-it-works.html
« Last Edit: August 01, 2012, 01:53:40 PM by Dеnis »
Regards,
Denis

Offline polsteam

  • Top Poster
  • *****
  • Posts: 815
    • View Profile
    • http://ships.greenet.pl/photo
Re: delivery of Innovation
« Reply #2 on: August 03, 2012, 05:14:37 PM »
Innovation has just departed from the port of Gdańsk for its homeport - Bremerhaven.