It simply means each of those lines onboard the ship have been pressure tested to 15 bar and are satisfactory. I can't remember how often these need to be done but 5 years is ringing a bell for some reason.
In case anyone asks, the lines are the pipes product, water, air, hydraulic fluid, etc run through.
Regards Robbie.